It is an ideal solution for outdoor or indoor server protection. Maximize energy efficiency with high-performance sealing and insulation. Stable base and frame support the weight of server cabinets and UPS battery systems. Robust and electromagnetic shielding enclosure ensure IT assets security, without worrying data leak.
It is an ideal solution for power equipment protection. Weather resistant materials and multi-layer anti-corrosion coating systems resist UV and extreme weather for a long time. Waterproof and dustproof design provides effective protection for internal equipment. The thermal management ensures excellent ventilation and heat dissipation.
It is an ideal solution for mine roadways. Thickened steel plates and a reinforced frame provide excellent seismic resistance. Advanced dust-tight sealing design effectively prevents mineral dust impacting vents or cables. Flexible lifting equipment ensures stable structure.
It is an ideal solution for hazardous areas, such as a refinery or chemical plant. Explosion-proof materials and explosion-resistant design withstand internal explosion pressure and prevent flame transmission. The integrated fire prevention device fits fire codes. It also uses C5-M marine anti-corrosion coatings to treat corrosive environments.
Cobowmac provides OEM solutions based on different scenario needs from engineering consultation, drawing design to engineering solution design and implementation.
Advanced equipments ensures production requirements on time, such as laser cutting machines, automated welding systems. Engineering experts with 10 years experience provide refined design and process solutions.
24-hour timely after-sales support your business progress. Cobowmac provides sustainable and portable package solutions based on your customization needs. Cobowmac also helps in logistics tracking to save your time.
Cobowmac not only provides a standard size of E-House enclosure, but also supports OEM service based on your drawings. You can collaborate with us about your engineering requirements and ideas.
Cobowmac operates a blasting and painting facility compliant with ISO 12944 standards. It uses multi-layer anti-corrosion coating with C3 to C5 levels. It is suitable for a complex environment and extreme weather conditions. Cobowmac also can offer ACE/FROSIO certified reports.
The delivery time is approximately 6-12 weeks based on project complexity and size of e-house enclosure. Cobowmac will follow project progress timely and provide comprehensive after-sales service, without worrying delay risk.
Cobowmac will analyze customer equipment weight and strengthen structural design with the FEA model for the base frame and floor.
Production lead time is based on your complexity and scale of the project. Cobowmac will evaluate your businesses needs and provide production time and delivery time, ensuring on-time delivery with strong manufacturing capabilities and refined operation.